AD plant capacity bands
Capacity here is electrical capacity, in kilowatts (kWe) or megawatts (MWe) of generating engine. 299 plants are under 500 kWe. Many farm plants sit just under 500 kWe or 250 kWe because those were feed-in tariff band limits.
| Capacity band | Plants | Known MWe |
|---|---|---|
| Under 250 kWe | 156 | 22.9 |
| 250-499 kWe | 143 | 66.0 |
| 500-999 kWe | 44 | 32.3 |
| 1-1.99 MWe | 119 | 157.4 |
| 2-4.99 MWe | 78 | 209.6 |
| 5 MWe and over | 22 | 191.9 |
| Not known | 76 | 0.0 |
Where the megawatts are
The 343 plants under 1 MWe make up 18% of known capacity; plants of 2 MWe and over make up 59%.
Known AD capacity by plant size (MWe)
Where the capacity figures come from
150 capacities come from the government's Renewable Energy Planning Database. Most of the rest are the declared net capacity of the plant's Ofgem-accredited station (Renewables Obligation or REGO) or the installed capacity of feed-in tariff installations in the same area. Each row's Capacity source column says which. A few figures for factory sites cover a whole site's generating plant, not just the digester; those are flagged and not used for a tonnage estimate.
How we estimate feedstock tonnes
We take the electricity a plant makes in a year (its Ofgem output where it's plausible, otherwise its capacity running at 85% of the time) and divide by a typical amount of electricity per tonne of fresh feedstock for that kind of plant:
| Feedstock type | kWh per tonne | Tonnes a year per MWe |
|---|---|---|
| Farm feedstock (crops/slurry) | 300 | 24,820 |
| Mixed feedstock (type unknown) | 285 | 26,126 |
| Food/organic waste | 270 | 27,578 |
So a 1 MWe farm plant comes out at roughly 24,820 tonnes a year. 479 plants have an estimate, adding up to about 11.3 million tonnes a year estimate. The Tonnes estimate basis column shows the sum for each plant.
Plants with no feedstock estimate
159 plants have no estimate, and the file says why:
- Sewage sludge plant: 65
- No capacity or output figure: 49
- Industrial effluent plant: 21
- Gas-to-grid plant with no electrical capacity: 13
- Probably not an AD plant: 9
- Capacity unusually large for one AD plant: 2
Sewage sludge and industrial effluent plants aren't estimated because their inputs are measured in very different units (dry solids, or effluent flow), and gas-to-grid plants with no engine have no electrical figure to work from.
Get the list
AD list + quarterly updates
£495 a year
+ VAT (£594) a year
- The full UK AD plant list now (Excel + CSV)
- 4 quarterly updates over the year
- A changes file each quarter: new, closed and changed plants
- Change vs last refresh column in every file
For £146 more than the one-off list you get the next four quarterly editions, each with a changes file. Renews yearly; cancel any time and keep the files you have had.
UK AD plant list
£349
+ VAT (£418.80), one-off
- Every UK AD plant (Excel + CSV)
- Capacity, output, feedstock estimate, gas-to-grid flag
- Operator, Companies House number, status and directors
One edition, dated 26 November 2026. No updates.
638 plants in the current edition. Pay by card through Stripe. Your files are emailed as a zip (Excel and CSV) within 15 minutes between 7am and 10pm; overnight orders arrive by 7:15am. Prices are plus VAT, which is added at checkout. You get a VAT receipt. For business buyers only; licensed for use in your own business.
See real rows in the free sample (directors' names removed).